Perspectives on Reauthorization

Perspectives on Reauthorization

Discussion of the Transit analysis for the Highway and Transit Conditions and Performance Report to Congress, Revising the Fixed Guideway Modernization Formula, and Implementing a SGR fund designed to sunset in 20 years, linked to SGR planning requirements (an asset management plan)

Publisher:
FTA

Publication Year:
2009

Report Number:
TAM-2009-0046

External Link

TAM Portal